we charter
GGW1
Set Gangway
Task Card Description
0
Remove the Dock Side (STB) Lines
GGW1
1
Set the dock safety lines on the cleats previously used by the STB side lines
GGW1
2
Remove the canal-side lines from the PORT side cleats
GGW1
3
Position the boat close to the finger dock so the STB sugar-scoop steps are within reach of the gangway
GGW1
4
Set a bow and stern spring line to the aft cleat so the boat stays locked in position
GGW1
6
After securing the aft position, set the bow spring line to the STB bow cleat to keep the boat parallel to the dock. The line is there from step 1. Make it tighter.
GGW1
7
Remove the nuts and bolts, leaving only the center safety pin in place
GGW1
8
Remove the gangway’s right-side line from the piling and hold it in your right hand
GGW1
9
With your left hand, loosen the gangway’s left-side line and hold the gangway in position
GGW1
10
Remove the white safety lines from the left side of the gangway. You are holding the gangway now.
GGW1
11
Lower the gangway on the boat side. Use the lines as reins to avoid swings and choose the position. The receiving crew member then takes it and sets it on a sugar scoop.
GGW1
12
If necessary, remove the center safety pin, reposition the gangway safety, and reinsert the safety pin
GGW1
13
Place a padded mat between the gangway and the boat to prevent dents
GGW1